40FT 30FT 20FT Prefab Expandable Container House Folding Prefabricated Tiny Home Villa Foldable Modular House

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information
Model NO.:Expandable Container House
Installation:Fast Installation
Material:Steel Structure
Style:Modern
Window:Aluminum Sliding Window
Door:Steel Door
Capacity:200 sets Per Month
HS Code:9406900090
Features: Earthquake Resistant, Easily Movable, Eco-Friendliness, Flexibly Combinable, Leak Proof, Moisture Proof, Safe, Thermal Insulation, Waterproof, Wind Resistance
Product Presentation
Technical Specifications
Component Material Details
Main Material Galvanized steel structure with sandwich panel wall and doors, windows, etc.
Roof 75mm EPS sandwich wall panel/Rock wool wall sandwich panel with ceiling
Floor MGO floor board + PVC flooring decoration
Wall 65mm/75mm Sandwich panel
Door Steel/aluminum frame (W870*H2040mm) or sliding glass door (W1900*H2000mm)
Window PVC/aluminum frame, double layer glass (5/8/5mm), dimension W800*H1100mm
Optional Furniture, sanitary, kitchen, A/C, electrical appliance, decorative panels, etc.
Frequently Asked Questions
How much manpower and time does it take to install the container?
Typically, it takes 4 workers approximately 4 hours to complete the installation of 1 unit.
What tools and equipment are needed for installation?
You will need a crane, cutting machine, hand drill, hexagonal screwdriver, utility knife, non-slip gloves, rivet gun, glass glue gun, tape measure, and a level meter.
Is a foundation required for the container house?
If the land is stable and will not subside, there is basically no need for a formal foundation. We provide guidance and complete foundation drawings based on your specific geological conditions.
How are the container houses insulated?
Wall panels are standard 50mm rock wool sandwich panels, which can be upgraded to 75mm or 100mm thickness for extreme weather conditions. The floor can also be covered with insulation.
Are the units waterproof and leak-proof?
Yes. Due to professional engineering and strict quality control, our overseas orders have a proven track record of zero water leakage problems.
What is the payment method and lead time?
Generally, the lead time is 7-15 days after deposit. Payment is usually via TT (30% deposit, 70% before shipment).

Related Products